Monday 9/29/14 Drawing day (place Exterior walls on floor plan drawing)
Tuesday 9/30/14 Drawing day (work on placing the interior walls)
Wednesday 10/1/14 Aim#10: Quiz#2
Thursday 10/2/14 Aim#11: What are the differnt types of Exterior and Interior doors?
Friday 10/3/14 Drawing Day (finish placing all interior walls)